To Design Instruction,
Option G:
Introduction to Risk Analysis (Grades 9-12)
Estimated Time: 6-8 hours.
Overview: Participants engage in a lesson designed around the
following benchmark:
3B Design and Systems (9-12)#4
Risk analysis is used to minimize the likelihood of unwanted side effects
of a new technology. The public perception of risk may depend, however,
on psychological factors as well as scientific ones.
Participants study the benchmark in depth and then analyze how effectively
the lesson’s content and pedagogy would contribute to students’ understanding
the benchmark. Next, they use a Project 2061 design procedure to design
a new lesson on a topic of their choice, and finally, if time permits,
they reflect on the design procedure they have used. Throughout, they study
and discuss relevant parts of
SFAA and
Benchmarks.
Select this option.
Return to list of options.